August 8th, 2019

Up coming work 8-12 to 8-16

Street Repair Crew

  1. WVU hanger at the Airport - blacktop repair
  2. Marion St near Monongalia - road repair
  3. 924 Garrison - road repair
  4. 385 Charleston - road and ditch repair
  5. 87 King St - repair road around manhole
  6. 324 Demain Ave - sidewalk and road repair
  7. 241 Kingwood - road repair
  8. 215 Wagner Alley - road repair
  9. 713 South Hills Drive - driveway repair

Service Crews

  1. 1053 Maple Dr – New Sewer Service (Digging across the street)
  2. 38 Champagne Dr – Possible Water leak
  3. 540 Glory Barn Rd – split existing ¾ service
  4. 732 Snider St – Possible Water Leak (digging in the street)
  5. 382 Laurel St – replace storm culvert ( digging edge of street)
  6. 900 Hawthorne Ave – fix broken meter pit Digging in grass)

Storm Crews

  • Grading the shop yard and laying drain pipe in back of yard so we can receive more fill
  • Drop cleaning University Ave

Other Work

  • Sewer cleaning crew will be cleaning the Deckers Grit Chamber
  • Main line crews will be at the Dorsey Knob lift station #1 installing new wet well and pumps then moving to new sewer install Whisper Creek
  • The 2nd main line crew will be relocating 8” water main at the WVU stadium then moving to the conduit install Kennedy Store Road for the Cobun Creek Dam #2 project