Project Info

Bid Due Date: Wednesday July 24, 2024 (10:00 am)

Apparent Low Bid: BEAR CONTRACTING

Bid Amount: $1,992,695.00

Bid Tab: View/Download

Awarded: Yes

Project Description:

The water main extension portion of the project is located in the area between the intersection of Corporate Drive (Rt. 46/4) and Chaplin Hill Road (Rt 19/24) and Lampman’s Way at the Westridge Development in Monongalia County, WV. The water booster station portion of the project is located near the intersection of University Town Centre Drive and Chaplin Hill Road (Rt 19/24).

The work includes construction of +/- 5,525 LF of 16” HDPE water line (open cut method), +/- 350’ of 16” HDPE directional drill, +/- 815’ of 16” PVC water line, 1,140’ of 12” PVC water line, installation of one (1) complete water booster station, demolition of one (1) existing water booster station and all other related appurtenances.

Mandatory Pre-Bid: Friday July 12, 2024 (10:30 am)

Advertisement to Bid: View/Download

Plan Holders List: View/Download

Addendum:

Project Engineer: Cory Jones, P.E.

Email Address: cjones@mub.org

Bid Status: Current Projects