Project Info

Bid Due Date: Thursday February 27, 2020 (3:00 pm)

Apparent Low Bid: Snider & Son, LLC ~ Morgantown, WV

Bid Amount: $ 227,825.00

Bid Tab: View/Download

Awarded: Yes

Project Description:

The work includes construction of the following projects:

Morris Bridge:

+/- 275 feet of 14” DR11 (IPS) HDPE casing pipe by directional drill method, +/- 275 feet of 8” DR11 (IPS) HDPE water line pipe installed into 14” HDPE casing, +/-50 feet of 8” DR11 (IPS) HDPE water line by open cut method, and all other related appurtenances.

Boyers Bridge:

+/- 450 feet of 14” DR11 (IPS) HDPE casing pipe by directional drill method, +/- 450 feet of 8” DR11 (IPS) HDPE water line pipe installed into 14” HDPE casing, +/-50 feet of 8” DR11 (IPS) HDPE water line by open cut method, and all other related appurtenances.

Plans/Specs: $100; Contact tkennedy@mub.org or 304-292-8445


Advertisement to Bid: View/Download

Plan Holders List: View/Download

Project Engineer: David Bragg

Email Address: dbragg@mub.org

Bid Status: Archive